Griffin lunar lander
Astrobotic's first lunar lander, Peregrine, suffered a propellant leak soon after reaching space and never reached the Moon. Griffin Mission One is the follow-up. It is designed to carry a payload similar in mass to NASA's VIPER rover to the south pole region. When NASA cancelled VIPER in July 2024, Astrolab's FLIP rover took its place, designed in about 18 months. FLIP will test autonomous driving, cargo transport and surface operations that future lunar exploration will need. In all, Griffin-1 will carry 10 payloads from six nations, plus four NASA payloads aboard the rover, on a SpaceX Falcon Heavy.
Follow Griffin lunar lander in your calendarGoogle CalendarApple / OutlookNo exact dates yet. Events appear in your calendar once a day is announced.
Timeline
Peregrine Mission One launchesAJan 2024
Griffin-1 lander unveiled before testing at JPLBJun 15, 2026
Griffin-1 launches on Falcon HeavyCQ4 2026
A Jan 2024 Peregrine Mission One launches
B Jun 15, 2026 Griffin-1 lander unveiled before testing at JPL
C Q4 2026 Griffin-1 launches on Falcon HeavyIN PROGRESS
News, Read