← Organizations

Relativity Space

Long Beach · Launch · ≈ 2,000 employees company-wide

Relativity Space builds rockets using large-scale metal 3D printing. Its first rocket, Terran 1, flew in 2023 as the first largely 3D-printed launch vehicle and did not reach orbit. The company then moved to Terran R, a reusable medium-to-heavy-lift rocket. Eric Schmidt, the former Google chief executive, began leading Relativity in 2025. In its September 2026 update the company reported all 13 engines installed on the first stage, and a wet dress rehearsal done at NASA's Stennis Space Center ahead of the second stage's first hot fire.

People
Programs
‹›
ProgramTimelineNext milestone
Terran R

Two-stage, partially reusable heavy-lift rocket with 13 Aeon R engines, built in Long Beach. Relativity reports a backlog of about $2.9 billion.

AnnouncedJun 2021 Former C-17 plant becomes factory2022 Terran 1 retired to focus on Terran RApr 2023 Eric Schmidt becomes CEOMar 2025 Aeon R engine qualifiedJul 2025 First launchQ4 2026 First launch · Q4 2026
Added to NSSL Phase 3 Lane 1Jul 7, 2026

CONTRACT · U.S. Space Force (Space Systems Command) · $5M
On-ramp as first upper-stage prime, with initial funding to compete for Lane 1 launches

Read →
Added to NSSL Phase 3 Lane 1Jul 7, 2026

CONTRACT · U.S. Space Force (Space Systems Command) · $5M
On-ramp via Relativity Federal, with initial funding to compete for Lane 1 launches

Read →
News, Read
All 13 engines are now on Terran R's first stageOct 6, 2026

Relativity's September update says all 13 Aeon R engines are installed on the thrust structure and the stage has moved into integrated testing. Engines for the second and third flights are already in production.

Read →
NASA adds Terran R to its launch services contractSep 9, 2026

NASA awarded Relativity Space a place on its NASA Launch Services II contract on September 9, using the contract's annual on-ramp for new rockets. The award makes Terran R available for future NASA missions, and NASA can also order launches for other agencies such as NOAA. The contract allows orders through June 2030 and runs through December 2032.

Read →