Relativity Space
Relativity Space builds rockets using large-scale metal 3D printing. Its first rocket, Terran 1, flew in 2023 as the first largely 3D-printed launch vehicle and did not reach orbit. The company then moved to Terran R, a reusable medium-to-heavy-lift rocket. Eric Schmidt, the former Google chief executive, began leading Relativity in 2025. In its September 2026 update the company reported all 13 engines installed on the first stage, and a wet dress rehearsal done at NASA's Stennis Space Center ahead of the second stage's first hot fire.
Two-stage, partially reusable heavy-lift rocket with 13 Aeon R engines, built in Long Beach. Relativity reports a backlog of about $2.9 billion.
AnnouncedJun 2021 Former C-17 plant becomes factory2022 Terran 1 retired to focus on Terran RApr 2023 Eric Schmidt becomes CEOMar 2025 Aeon R engine qualifiedJul 2025 First launchQ4 2026 First launch · Q4 2026CONTRACT · U.S. Space Force (Space Systems Command) · $5M
On-ramp as first upper-stage prime, with initial funding to compete for Lane 1 launches
CONTRACT · U.S. Space Force (Space Systems Command) · $5M
On-ramp via Relativity Federal, with initial funding to compete for Lane 1 launches
Relativity's September update says all 13 Aeon R engines are installed on the thrust structure and the stage has moved into integrated testing. Engines for the second and third flights are already in production.
Read →NASA awarded Relativity Space a place on its NASA Launch Services II contract on September 9, using the contract's annual on-ramp for new rockets. The award makes Terran R available for future NASA missions, and NASA can also order launches for other agencies such as NOAA. The contract allows orders through June 2030 and runs through December 2032.
Read →