← Organizations

ISRO

Bengaluru, India · Space agency · Government · headcount not published

Vikram Sarabhai, called the founding father of the Indian space programme, led the team that built it. INCOSPAR was set up in 1962, and ISRO replaced it in August 1969. India's first satellite, Aryabhata, launched in 1975 on a Soviet rocket. In 1980 the indigenous SLV-3 put RS-1 into orbit. The Mars Orbiter Mission, launched in 2013, made India the first country to reach Martian orbit on its first attempt, and Chandrayaan-3 landed near the Moon's south pole in August 2023. ISRO is now developing Gaganyaan, a crewed spacecraft, and aims to have the Bharatiya Antariksh Station operating by 2035.

People
Programs
‹›
ProgramTimelineNext milestone
Gaganyaan

India's human spaceflight program. The uncrewed G1 flight carries the Vyommitra humanoid robot before astronauts fly.

TV-D1 crew escape testOct 2023 Crew and service module separation tests completedOct 16, 2026 G1 uncrewed flightQ4 2026 First crewed flightQ1 2027 G1 uncrewed flight · Q4 2026
Bharatiya Antariksh Station (BAS-1)

The first module of India's planned space station, to be launched on an LVM3 as a testbed for human spaceflight, ahead of a five-module station by 2035. Developed by ISRO.

Union Cabinet approves BAS-1 developmentSep 2024 ISRO unveils a 1:1 scale model of the moduleAug 2025 Target launch of BAS-1By 2028 Target launch of BAS-1 · By 2028
NavIC second-generation satellites (NVS)

ISRO's NVS series replaces aging satellites in India's regional NavIC navigation constellation. NVS-03 flew on GSLV-F18 from Sriharikota.

NVS-03 launched on GSLV-F18Oct 30, 2026 NVS-04 and NVS-05 launchesDate TBA NVS-04 and NVS-05 launches · Date TBA
News, Read
GSLV puts India's NVS-03 navigation satellite in orbitOct 31, 2026

ISRO's GSLV-F18 launched NVS-03 late on Oct. 30 and placed it in geostationary transfer orbit. The satellite will use its own engine to climb to geostationary orbit over the next few days, a step that matters: NVS-02 reached transfer orbit but never made it to its slot because of a pyro valve problem. NVS-03 joins NavIC, India's own navigation system, which covers India and about 1,500 km beyond. It was the GSLV's 20th flight and its fastest turnaround, 56 days after the previous mission.

Read →
ISRO fires the gas generator of its new methane engineOct 19, 2026

ISRO ignited the full-scale gas generator of its 1,100-kilonewton LME-1100 engine on October 9, with the complete engine due by mid-2027 for hot-fire qualification tests. It has also finished the design of a 2,400-kilonewton methane engine using full-flow staged combustion, the cycle in SpaceX's Raptor, for a future heavy-lift rocket meant to support India's crewed Moon landing.

Read →
ISRO breaks ground on a space tracking radar center in AssamSep 21, 2026

Assam's chief minister laid the foundation stone on September 21 for ISRO's Advanced Radar Research Centre at Chandrapur, near Guwahati. The center, built by ISRO's tracking network ISTRAC, is part of Project NETRA and will track objects and debris in orbit to protect India's satellites. It is the first major space surveillance site in India's Northeast, on about 70 acres provided by the state.

Read →
ISRO ends an eight-month lull and launches its first geo-imaging satelliteSep 4, 2026

A GSLV Mk-II flew EOS-05 on September 4, the first Indian imaging satellite built to work from geosynchronous orbit. It is ISRO's first successful launch of 2026, after PSLV-C61 and PSLV-C62 both had third-stage anomalies. The satellite reached an apogee of about 31,000 km, and ISRO's chairman said it could stretch its life by at least three years.

Read →
NASA invites India to join its Moon Base programAug 11, 2026

The invitation came at the ninth India-U.S. Civil Space Joint Working Group meeting in Bengaluru. NASA describes the program as building humanity's first outpost on another celestial body, near the lunar south pole. The two sides also agreed to advance talks on open scientific data sharing under the Artemis Accords.

Read →